Engineering the Future of Offshore Access

DSC01842

Bridge of Tomorrow a cutting-edge development project led by NOS Technology in close collaboration with Noble, and fully financed by Aker BP. From its inception to its current phase of assembly and completion, the project has exemplified innovation, precision, and cross-disciplinary engineering excellence.

 

 

From concept to completion, NOST has delivered a robust bridge solution shaped by a comprehensive FEED study and full-scope engineering for the Interface Frame and Staircase and Bridge Assembly. The project advanced through fabrication, testing, and offshore preparation, including structural follow-up, electrical integration, software testing, and corrosion protection.

Final assembly and verification were completed at NOS’s Sandnes facility, with offshore readiness secured in compliance with DNV standards. The project was driven by close collaboration between NOST, Noble, and Aker BP.

The Bridge of Tomorrow combines telescopic sections with motorized control, modular handrails and ramps, corrosion-resistant materials, and smart software systems – designed to meet the evolving needs of offshore operations.

 


Â